Installation


Firstly, please check all the packing whether is in good condition, and take out it in a good place.

1)  Installment of transmission frame

2)  Installment of the machine


Before installment machine, please ensure that the ground is concrete floor


After installing frame, please connect them with the machine


Adjust the legs of machine & frames, make sure them in the same level (frame surface, belt surface in the same level)


When the level adjustment done, we can use concrete and brick to make a water surround, to collect the cycled water


machine-layout.png



Technique Support


Preparation work before installing

In order to install machine smoothly, please arrange some preparation work:

1) Power source wire requirement: 4x16 mm2  (the length should be calculated according to the distance from the box to the machine)

    Voltage should be 380V/50Hz/3phase

2) Enough power supply for 35kw(according to the Max rated power )

3) Air compressor 8kg pressure (if the factory have it already, just connect one of them with the air pipe)

4) Air pipe 8mm (the actual length depends on the distance between the factory air compressor and the machine)

5) Water pump: diameter 50mm, 1.5kw

6) Site requirements: concrete floor

7) A pool with three rooms: 10-12 CBM(for better dealing with the mud and water). 